Gawber Road WMC

We have carried out new installation of Energy Efficient cellar cooling system at Gawber Road WMC, the work was carried out over 2 days and involved removing of the old obsolete system and installing and testing a new single phase electrical supply. The condensate water from the new system has been plumbed outside into the existing drainage down pipe removing the moisture from the cellar. Whilst on site we serviced the sites other cellar cooling system and carried out full maintenance on the bottle coolers and ice machine.