commercial-office-aircon (1)

Air conditioning installation Leeds

New airconditioning for Bartech Br midway through 6 week installation of new airconditioning for Bartech, the 6 week project will invlove installation of 26 indoor evaporator of various styles and sizes controlled by 3 large outdoor VRF inverter heat pumps. the systems will be able to cool the...

Cold room installation Leeds

Cool installation @Frankie & Bennys Leeds BR installed the new freezer cooling system recently at Frankies Leeds...

extraction

Kitchen Hood Extractor repairs

Barnsley Rugby Union Football Club BR responded to emergency extraction unit failure late Saturday evening at Barnsley a Rugby Club-  we replaced the faulty extractor on the Monday - normal service at the club now resumed!...

worksop-aircon

Air conditioning installation Worksop

Airconditioning installation @Anpario offices BR installed new airconditioning and ventilation at Anpario at Worksop over 3 weeks as part of a refurbishment project with APSS interiors...

chiquitos-cellar-cooler (1)

Cellar cooler installation Sheffield

Cool installation at Chiquitos Following a reactive breakdown the existing cooling equipment was found to beyond economical repair - we measured up, designed, quoted then installed the same week - cellar cooler installations from BR come with 3 years warranty as standard...

catering-insight

Contract award

Sheffield University contracts awarded to BR Following a long tender process we have been offered the cooling works at Sheffield University, Sheffield Student Union and Sheffield Hallam University  - this contract award got us a mention in this months Catering Insight Magazine...

brewhouse-sheffield (1)

Cooling installations Sheffield

BR carried out various cooler installations for the brew house at Sheffield - we carried out a full cooling, electrical and mechanical package - we will offer a service contract to compliment the installation...

balby-fitness-village-installation

Air conditioning installation Doncaster

Balby fitness village BR installed new Mitsubishi airconditioning at Balby Fitness Village for Doncaster Culture & Leisure Trust, we offered a full cooling, electrical and mechanical package, all,works carried out during the night to allow no disruption to the gymnasium - unit will be placed on service contract to compliment the manufacturers...

server-room-aircon-medical-centre

Leeds airconditioning Server room aircon

Air conditioning Leeds installation Completed full replacement electrical and mechanical Server room airconditoner. The moisture from the aircon has been plumbed straight outside in to existing downpipe. The customer signed up to maintenance twice per year to compliment the manufacturers warranty...